DESKTOP POWER

Power Strips

Regional power strip platforms developed for retail, office and private-label power programs.

ECS-US013 desktop power stripRepresentative Product · ECS-US013

Source the right platform

  • Desktop Power Strips
  • Flat Plug Power Strips
  • USB-C Power Strips
  • Individual Switch Power Strips
  • Surge Protector Power Strips

Compare, validate and source

Move from product selection to technical evidence, compare broader power strip and wall outlet platforms, and prepare an RFQ-ready program.

Plan a power strip OEM program by market

Who we manufacture for

Distributors, retailers, hospitality suppliers and private-label brands sourcing desktop, home and travel power distribution products.

Core product platforms

Desktop power strips, tower power strips and market-specific socket layouts available across the current product range.

Target markets

US, UK, EU and Australian projects, subject to the selected model and final configuration.

Key specifications

Plug and socket standard, AC rating, outlet count, USB charging, cable length, overload protection, housing and mounting format.

OEM / ODM options

Logo, color, cord, packaging and manual options are reviewed per platform; deeper ODM work is scoped separately.

Commercial planning

MOQ: 1,000 pcs standard; from 500 pcs on existing models with neutral packaging.
Lead time: 3-day stock samples; about 35 days for 1,000–5,000 pcs, about 40 days above 5,000.

Testing and quality

Inspection and test scope is agreed against the final configuration; published engineering evidence is linked where available.

Compliance support

Applicable documentation and destination-market requirements are reviewed for the final product configuration. No category-level claim replaces model verification.

Packaging and customization

Share channel, pack format, languages, artwork status and labeling requirements for feasibility review.

Buyer FAQ

What is the MOQ?

Standard MOQ is 1,000 pcs per model. For a first order, start from 500 pcs on an existing model with your logo and neutral packaging, or mix models at 500 pcs each.

What determines lead time?

Stock samples ship in 3 days. Mass production takes about 35 days for 1,000–5,000 pcs and about 40 days above 5,000. New tooling, custom packaging and certification work add time, which we schedule in the quote.

What should an RFQ include?

Include product or model, quantity, target market, required specifications, customization, packaging and required timeline.

Request a project-specific quote