WALL-MOUNTED POWER

Wall Outlet Extenders

A unified wall outlet extender range covering WPG series, wall taps, USB wall outlets and surge wall outlet formats.

WPG05 wall outlet extenderRepresentative Product · WPG05

Compare, validate and source

Move from product selection to technical evidence and an RFQ-ready program.

Specify a wall outlet extender for the target channel

Who we manufacture for

Retailers, distributors, hospitality programs and private-label sellers sourcing compact wall-mounted power expansion products.

Core product platforms

Multi-outlet wall extenders and wall-mounted charging platforms selected by plug, socket and port requirements.

Target markets

Destination-market configuration is confirmed before samples, documentation review and quotation.

Key specifications

Plug type, outlet layout, AC rating, USB ports, mechanical support, clearance, housing dimensions and final market claims.

OEM / ODM options

Branding, color, packaging and manual options for compatible platforms; ODM feasibility depends on architecture and tooling scope.

Commercial planning

MOQ: 1,000 pcs standard; from 500 pcs on existing models with neutral packaging.
Lead time: 3-day stock samples; about 35 days for 1,000–5,000 pcs, about 40 days above 5,000.

Testing and quality

Inspection and test scope is agreed against the final configuration; published engineering evidence is linked where available.

Compliance support

Applicable documentation and destination-market requirements are reviewed for the final product configuration. No category-level claim replaces model verification.

Packaging and customization

Share channel, pack format, languages, artwork status and labeling requirements for feasibility review.

Buyer FAQ

What is the MOQ?

Standard MOQ is 1,000 pcs per model. For a first order, start from 500 pcs on an existing model with your logo and neutral packaging, or mix models at 500 pcs each.

What determines lead time?

Stock samples ship in 3 days. Mass production takes about 35 days for 1,000–5,000 pcs and about 40 days above 5,000. New tooling, custom packaging and certification work add time, which we schedule in the quote.

What should an RFQ include?

Include product or model, quantity, target market, required specifications, customization, packaging and required timeline.

Request a project-specific quote